Dragon Stage Build – Date: June 2012 – October 2012

The Dragon Stage was designed and built by Subnation for The Oktoberfest Festival 2012 North Goa. Subnation was both the chief designer and project manager for this installation, which included all conceptual and working drawings, for all aspects of the dragon stage build.

In early 2012 Subnation was approached to put forward a concept for a main stage at Oktoberfest. A fire breathing dragon was designed and agreed by the team, they then set about making sketches, drawings and then to cad design.

Dragon Stage Build – Date: June 2012 – October 2012

The Dragon Stage was designed and built by Subnation for The Oktoberfest Festival 2012 North Goa. Subnation was both the chief designer and project manager for this installation, which included all conceptual and working drawings, for all aspects of the dragon stage build.

In early 2012 Subnation was approached to put forward a concept for a main stage at Oktoberfest. A fire breathing dragon was designed and agreed by the team, they then set about making sketches, drawings and then to cad design.

2D Concept Design:

CAD Design

Designing the concepts, all working drawings for the dragon stage build, we under took all construction work from start to finish. The Dragon stage build was 30 meters wide and 10 meters high when completed, with the DJ booth mounted in the mouth, and fire shooting out of it nose and horns.

From the concept through to fabrication, the handpicked specialised team at Subnation took only 6 weeks to complete.

From the first dragon drawings, it was our passion, against any odds that pyrotechnics were to be heavily incorporated into the build, taking festival staging to the next level. Pyrotechnics were to feature in the dragons face & horns, therefore the whole installation had to be fabricated and sculpted from metal.

This was a challenging build for us, as the complete structure had to be built off site, without the opportunity to do a full stage assembly in advance and then packed into 6 trucks including a crane and transported to the venue, with 2 days on site to install and errect.